Every remodel is different, but there are some things that you can plan for. The basic installation process includes these steps:
Step 1: Your old kitchen will be torn out.
Step 2: New electrical, if required, is installed.
Step 3: New plumbing, if required, is installed.
Step 4: The walls are repaired and prepped for paint.
Step 5: The cabinets are installed.
Step 6: The top is measured and a template is made.
Step 7: The trim for the cabinets is installed.
Step 8: After the countertop is fabricated or cut to size, the top is installed.
Step 9: The final plumbing is connected and your kitchen is functioning once again.
Step 10: The new floor is installed, where applicable.